Reference of Tisza Site Railway network development​
Client: MOL Petrolkémia Zártkörűen MűködÅ‘ Részvénytársaság
Period: 2019.10.03. – 2021.11.30.
Place: MOL Nyrt. – Tiszaújváros site
​
Technical content of the contract:
Construction of railway storage tracks, stabling tracks at the Tisza Refinery and implementation of the eastern connecting track in the I-II centuries. establishment, facility III and installations IV to V. for the construction of facilities.
UIC 60 rail joint, webbing rail joint, concrete sleeper, B60-XIII., B60-XIV. and B60-XVI. system switch, 35 cm effective crushed stone, 20 cm SZK1 layer and geotextile
​
Designing:
• 4682 vfm railway track
• Domino 55 interlocking system expansion
• spatial lighting system
• utility replacements
• railway signalling devices
• track accessories
• 3 road crossings (1 guide rail, 2 Strail)
• drainage, leakage system
• Detour for 16 groups
• reconstruction and extension of a 77 m superstructure pedestrian and filling plant bridge over railway tracks with steel superstructure
• Licensing and construction design of dynamic track scales
​